Pasig, Metro Manila, NCR

Why two Metro Manila rooftops can produce different yields

A 6.16 kWp Meralco pilot in Pasig produced 6.87 MWh in its first year—lower specific yield than the documented Marikina example, illustrating site and period variability.

Representative commercial rooftop solar array used to illustrate an urban pilot project
Representative commercial rooftop solar installation. This photograph is not either documented Metro Manila pilot roof.

Documented project figures

System size: 6.16 kWp

System type: Grid-tied

Documented annual output: 6,870 kWh

Specific yield: 1,115 kWh/kWp/year

Evidence period: DOE-documented first year

Evidence strength: ModerateGovernment project documentation
National-range comparison: 1,115 kWh/kWp/year is within the national planning range. Reference range: 1,1001,500.

What the source does not prove

The first-year pilot result does not isolate every cause of the lower specific yield and should not be treated as a permanent forecast for Pasig.
Documented output6,870 kWh

What this should change in your planning

  • Do not copy a nearby project's yield without checking roof and system conditions.
  • A production range is safer than one precise promise.
  • Ask installers to disclose weather, shade, loss, and availability assumptions.

How to compare this case with your own project

Start with capacity, system type, location, evidence period, and specific yield. This 6.16 kWp project documents 6,870 kWh of annual production, but that figure should not be copied directly into another property. Roof orientation, shade, weather, inverter limits, downtime, maintenance, and the share of electricity used during daylight can change both production and financial value. Compare the documented yield with the visible national planning range, then enter your own bill, roof, and backup requirements in the calculators.

Treat the project as evidence, not a promise of identical results.